New Construction Roofing
New-construction roofing for custom homes and builders — installed from the deck up, on schedule.
Licensed & Insured
Credentialed local crews
Workmanship Warranty
In writing, every job
Free Estimates
No pressure, no surprises
Hassle-Free Claims
We work with your adjuster
Building the Roof From the Deck Up
New construction roofing is the cleanest job in the trade. There is no old material to tear off, no hidden damage to discover, and no compromises forced by decades of weathering. The deck is fresh, the framing is straight, and every component — underlayment, flashing, shingles, ventilation — goes down on a clean slate. The challenge is different: the roof must be installed on a construction schedule, coordinated with other trades, and built to exact specs with zero callbacks.
We install roofing on new custom homes, production builds, additions, and accessory structures. Our crews work with builders to meet construction schedules, coordinate with framing and electrical trades, and deliver a roof system that passes inspection the first time and performs for decades.
New Construction Roofing Materials
| Material | Cost per square (installed) | Lifespan | Best for |
|---|---|---|---|
| Architectural shingles | $350 – $550 | 25 – 30 years | Most production and custom homes |
| Luxury shingles | $500 – $900 | 30 – 50 years | Premium custom homes |
| Standing-seam metal | $800 – $1,400 | 40 – 70 years | Modern, farm, coastal, energy-efficient |
| Clay or concrete tile | $700 – $1,200 | 50 – 100 years | Mediterranean, Spanish, warm climates |
| Slate | $1,000 – $2,500 | 75 – 200+ years | Historic, estate, premium |
| Cedar shake | $600 – $950 | 30 – 50 years | Mountain, lake, rustic |
We help builders and homeowners choose the material that matches the architectural style, climate zone, and budget. Every material has specific installation requirements that we coordinate with the framing and design teams.
How We Roof a New Build
- Plan review — we review the architectural plans, verify roof pitch, identify penetrations (plumbing, HVAC, electrical), and confirm the material specs
- Deck installation coordination — we work with the framing crew to verify deck thickness, fastener pattern, and slope before roofing begins
- Underlayment — ice and water barrier at eaves, valleys, and penetrations; synthetic underlayment across the entire deck
- Drip edge and starter — metal drip edge at eaves and rakes; starter shingles along the eave line
- Field installation — shingles, metal panels, tile, or other material installed per manufacturer specs with proper fastening, exposure, and offset
- Flashing — step flashing at walls, counter flashing at chimneys, pipe boot collars, valley metal — all new, all to spec
- Ventilation — ridge vent and soffit vents balanced for the attic area; powered fans if specified
- Inspection — we coordinate with the building inspector for framing and roofing inspections
- Punch list — we walk the roof with the builder and homeowner, address any touch-ups, and deliver the warranty documentation
New Construction Roofing Costs
Costs depend on material choice, roof complexity, and local labor rates.
| Component | Typical range |
|---|---|
| Architectural shingle roof (avg 2,000 sq ft roof) | $8,000 – $15,000 |
| Metal roof (avg 2,000 sq ft roof) | $18,000 – $35,000 |
| Tile roof (avg 2,000 sq ft roof) | $20,000 – $45,000 |
| Ice and water barrier (per square) | $50 – $100 |
| Synthetic underlayment (per square) | $30 – $60 |
| Flashing package | $1,500 – $4,000 |
We provide builder pricing for production projects and detailed estimates for custom homes. Every quote includes all materials, labor, flashing, ventilation, and warranty.
Material Selection Guide for Builders
Choosing the right roofing material during the design phase saves time, money, and callbacks. Here is how the major materials compare for new construction.
| Factor | Shingles | Metal | Tile | Slate |
|---|---|---|---|---|
| Framing impact | Standard — no reinforcement | Standard for standing seam | May require reinforced trusses | Requires structural engineering |
| Installation speed | Fast — 2 to 4 days | Moderate — 4 to 6 days | Slow — 7 to 14 days | Slow — 7 to 14 days |
| Weight per square | 200 – 350 lbs | 100 – 200 lbs | 800 – 1,200 lbs | 1,000 – 1,500 lbs |
| Underlayment | Standard synthetic | Standard synthetic | Ice and water mandatory | Ice and water mandatory |
| Code requirements | Standard | Standard | May require engineering | Always requires engineering |
| Builder markup | Lowest | Moderate | Higher | Highest |
Tile and slate require structural verification early in the design process. If the trusses are designed for shingle weight, switching to tile later means retrofitting the framing — an expensive change. Metal is structurally compatible with standard framing and offers the best longevity-to-weight ratio.
The Roofing Specification: What Builders Need
A roofing specification document prevents misunderstandings between the builder, the homeowner, and the roofer. We help builders write specifications that cover every component.
A complete roofing spec includes:
- Material type and product — specific manufacturer, product line, and color
- Underlayment type — ice and water barrier locations, synthetic underlayment brand
- Flashing specification — material type, gauge, and placement at every penetration and wall transition
- Ventilation spec — intake and exhaust vent types, quantities, and placement
- Fastener pattern — nail type, count per shingle, and attachment method
- Warranty terms — workmanship warranty duration, manufacturer warranty registration requirements
Clear specifications prevent callbacks caused by miscommunication. When every party knows the exact materials and methods, the roof goes in correctly the first time.
Coordination With Other Trades
New construction roofing does not happen in isolation. We coordinate with several trades to avoid conflicts and rework.
Framing crew: We verify deck thickness (minimum 7/16-inch OSB or 1/2-inch plywood for most shingle systems), fastener spacing, and roof pitch before roofing begins. Any framing deficiencies must be corrected before we install the deck substrate.
Electrician: Electrical penetrations through the roof — attic fans, skylights, solar conduit — must be coordinated so our flashing details accommodate their penetrations. We flash every penetration; no exceptions.
HV contractor: HVAC units on the roof, exhaust vents, and gas flues all require flashing details that integrate with the roofing system. We install counter flashing around all curb-mounted equipment.
Plumber: Plumbing vent stacks penetrate the roof at locations determined by the floor plan. We install pipe boot collars at every stack and verify they are included in the underlayment and flashing sequence.
Insulation contractor: Attic insulation installation must not block soffit vents. We install ventilation baffles at every eave before insulation goes in to maintain proper attic airflow.
Early coordination prevents the most common new-build roofing problems: blocked ventilation, unflashed penetrations, and damaged roofing from other trades walking on completed work.
Why Builders Choose Us
- Schedule reliability — we show up when promised and finish on time; we understand the construction timeline and the cost of delays
- Quality installation — every nail, every shingle, every flashing joint is done to spec; our inspection pass rate is near 100 percent
- Coordination — we work with framers, electricians, and HVAC contractors to time our work around their penetrations and curbs
- Warranty — we provide both workmanship and manufacturer warranties that the homeowner can transfer if they sell
- Communication — the builder gets a single point of contact, daily progress updates, and photos of completed work
Building a new home or addition? Call us or request a builder estimate — we will review your plans, recommend the right roofing system, and schedule the work to meet your construction timeline.
FAQ
Frequently Asked Questions
When should the roofer be involved in a new build?
The roofer should review plans during the design phase to verify roof pitch, confirm material specs, and identify penetrations. Early coordination prevents costly changes after framing is complete.
What underlayment goes under a new roof?
Ice and water barrier is installed at eaves, valleys, and all penetrations. Synthetic underlayment covers the rest of the deck. This two-layer approach provides both impact resistance and a secondary weather barrier.
How long does roofing take on a new construction project?
Most residential new-build roofing takes three to seven days depending on roof complexity, material type, and weather. Metal and tile roofs take longer due to installation precision requirements.
Can I upgrade roofing material after the builder specifies it?
Yes, but it is more cost-effective to choose your material during the design phase. Upgrading later means the framing may need reinforcement for heavier materials like tile or slate, and the schedule may be affected.
What warranty do I get on a new construction roof?
You receive both a manufacturer warranty on the material (typically 25 to 50 years) and a workmanship warranty from us covering the installation. Both warranties are transferable if you sell the home.
By State
New Construction Roofing by State
Free Estimates
Get a Free Roof Estimate
Talk to a local roofing expert today. Fast, honest estimates with no pressure.